Estate Residential Steel Framing

The Diggers Rest development is a prime example of how light gauge steel framing streamlines large-scale residential construction. Spread across a growing estate, this project involved the supply and installation of wall frames, roof trusses and floor systems for multiple homes being built in sequence.

Prefabricated components were manufactured off-site by LGS Solutions and delivered to the site in organised bundles. This approach ensured builders could progress efficiently, with frames craned or lifted directly into position as foundations were completed. The result was a consistent, repeatable process that kept the estate build moving at pace while maintaining accuracy across every dwelling.

Aerial images highlight the scale of the project, with rows of homes taking shape simultaneously. From stacked trusses waiting to be installed to fully framed structures ready for cladding, each stage of the estate demonstrates the flexibility and speed of prefabricated steel.

Beyond speed, the choice of steel ensures long-term performance for every household. Frames that resist termites, fire and moisture provide confidence for both developers and future residents, while straight walls and true rooflines deliver quality finishes.

timbarra pkwy steel framing melbourne 13
Timbarra-Pkwy
tennyson elwood steel framing melbourne 09
Tennyson Elwood
templestowe steel framing melbourne 15
Templestowe
Scroll to Top